The UK government's decarbonisation readiness requirements will require new and substantially refurbishing power plants in England to be carbon capture or hydrogen-ready. The requirements align with the government's mission to accelerate the transition to clean power and net zero and so are considered a key part of the energy transition. In our latest analysis of the steps being taken to achieve Clean Power 2030, we assess the scope, how existing requirements are changing and what the implications are for investors. Click here to read the article on our sister blog HSF Energy Notes.

 

 

Related categories

Key contacts

Sarah Pollock photo

Sarah Pollock

Partner, Head of Energy Sector, London

Dr Silke Goldberg photo

Dr Silke Goldberg

Partner, London and Israel Group

Amanda Tsangalis photo

Amanda Tsangalis

Senior Associate (Australia), London

Sarah Pollock Dr Silke Goldberg Joanne Holbrook Amanda Tsangalis Bozidar Bogosavljev Kate Laidlow-Singh